SemiAnalysis visits an 800MW AI campus in Inner Mongolia
SemiAnalysis describes a visit to a wind-powered, 800MW campus in Inner Mongolia, with 120MW reportedly built within a year. Its overview also highlights a 5MW pilot using solid-state transformers and 800V direct current, alongside cooling without central chillers. The account connects AI infrastructure expansion to power conversion and thermal design. Those engineering choices matter because usable compute capacity depends on the speed and efficiency of the entire facility, beyond the accelerators installed inside.









